STRUCTURAL ASSEMBLY AND FABRICATION DRAWINGS
2022
In this major project to extend GCO's facilities, challenge 2000 called on WISE-LAB to manage 3 structures for which the following work was carried out:
- Assembly design to GCO standards;
- GA Drawings
- Assembly drawings;
- Flow drawings;
- MTO.
Structures under WISE-LAB load :
- MCC;
- Office Building Skid;
- Container Skid.